It completely depends on your preference.
As built drawings title block.
4 3 order of sheets in a set of drawings.
Reference to major assemblies or end items shall not be used except when necessary to differentiate similar items.
01 toc 3 table of contents general drafting procedures.
Where a client asked for less detail it would be as built rev 1.
08oct2010 sheet 3 of 7 file no.
Nonpart drawings such as schematic diagrams shall include the drawing type as part of the title for example.
The name of the cad software used and its version the name of the drawing file the name of the source part or assembly file.
In addition to the information above for drawings produced using cad software it is highly recommended to have the following information in the title block.
Add to the title block that the new drawings are as built and adding your name and contact should be acceptable.
This information defines where freecad can and can not place the projections.
We have a title block notation that states.
As built drawings defined the as built drawings comprise a revised set of construction drawings that are submitted by the contractor when a complete project or individual stages of a project are completed.
Title block in addition to these rules since freecad 0 14 information about the border and title block can be added to the template for use by the orthographic projection tool.
Section 19 2 record as built drawings for distribution engineering 19 2 3 s n 6 shp references before proceeding to the query data step see section 8 0 utilizing gis data via fdo connection page 8 0 7 the inspector s gps points shp files can be loaded to help determine the actual project area geospatially within the drawing.
As for signing i would avoid unless absolutely required by the city.
Even then a note should accompany your signature to the effect that the design is not yours.
However replacing the engineer s title block is a no no.
Title blocks to be used on drawings prepared for the rta by external consultants shall be submitted to the rta for approval prior to commencement of drafting activities.
These as built drawings are based on the approved revision 4 drawings for this project reflecting modifications for field conditions if we had to revise it and that s only happened once.